==2628 Swarm MasterPlan==
 
==2628 Swarm MasterPlan==
  
Conclusions of the commission meeting on 18-10-13:
+
Conclusions of the commission meeting on '''18-10-2013''':
 
<br>
 
<br>
  
Line 28: Line 28:
  
  
Conclusions of the inter-group meeting on 27/9. Further meetings are probably necessary.
+
Conclusions of the inter-group meeting on '''27-09-2013''':
  
  

Revision as of 11:06, 21 October 2013


Concept Process



2628 Swarm MasterPlan

Conclusions of the commission meeting on 18-10-2013:

Programme and connections




Conclusions of the inter-group meeting on 27-09-2013:


each cell’s public space connects to each adjacent cell’s public space

each cell’s built space connects to each adjacent cell’s built space

resulting in two systems (public space and built space) that are continous and are intertwined with each other.

The system is non-hierarchical and spatially organised like a sponge.



Slide 1
Slide 2
Slide 3
Slide 4