Difference between revisions of "Shared:2628SwarmMasterPlan"

From 2628Climator
Jump to: navigation, search
(2628 Swarm MasterPlan)
(2628 Swarm MasterPlan)
Line 21: Line 21:
 
'''Midterm presentation template'''<br>
 
'''Midterm presentation template'''<br>
 
[[File:Template midterm.zip]]
 
[[File:Template midterm.zip]]
<br>
+
<br><br>
  
 
Conclusions of the commission meeting on '''18-10-2013''':
 
Conclusions of the commission meeting on '''18-10-2013''':

Revision as of 21:07, 1 November 2013


Concept Process



2628 Swarm MasterPlan


Midterm presentation template
File:Template midterm.zip

Conclusions of the commission meeting on 18-10-2013:

Programme and connections




Conclusions of the inter-group meeting on 27-09-2013:


each cell’s public space connects to each adjacent cell’s public space

each cell’s built space connects to each adjacent cell’s built space

resulting in two systems (public space and built space) that are continous and are intertwined with each other.

The system is non-hierarchical and spatially organised like a sponge.



Slide 1
Slide 2
Slide 3
Slide 4