Difference between revisions of "Shared:2628SwarmMasterPlan"

From 2628Climator
Jump to: navigation, search
(2628 Swarm MasterPlan)
(2628 Swarm MasterPlan)
Line 24: Line 24:
 
<br>
 
<br>
  
 +
[[File:MASTER_PLAN_3.004.jpg|850px|thumb|left|COMMON OPEN SPACE]]
 +
<br>
 +
 +
[[File:MASTER_PLAN_3.008.jpg|850px|thumb|left|COMMON OPEN SPACE]]
 +
<br>
  
  

Revision as of 12:58, 13 December 2013


Concept Process



2628 Swarm MasterPlan

MERGE OF OPEN SPACE FOR MASTER PLAN 13-12-2013:

COMMON OPEN SPACE


COMMON OPEN SPACE


COMMON OPEN SPACE



COMPILATION OF OPEN SPACE FOR MASTER PLAN 06-12-2013:

COMMON OPEN SPACE




Midterm presentation template
File:Template midterm.zip

Conclusions of the commission meeting on 18-10-2013:

Programme and connections




Conclusions of the inter-group meeting on 27-09-2013:


each cell’s public space connects to each adjacent cell’s public space

each cell’s built space connects to each adjacent cell’s built space

resulting in two systems (public space and built space) that are continous and are intertwined with each other.

The system is non-hierarchical and spatially organised like a sponge.



Slide 1
Slide 2
Slide 3
Slide 4