Shared:2628SwarmMasterPlan

From 2628Climator
Revision as of 12:36, 20 October 2013 by Vicky (Talk | contribs)

Jump to: navigation, search


Concept Process



2628 Swarm MasterPlan

Conclusions of the commission meeting on 18-10-13:

Programme and connections




Conclusions of the inter-group meeting on 27/9. Further meetings are probably necessary.


each cell’s public space connects to each adjacent cell’s public space

each cell’s built space connects to each adjacent cell’s built space

resulting in two systems (public space and built space) that are continous and are intertwined with each other.

The system is non-hierarchical and spatially organised like a sponge.



Slide 1
Slide 2
Slide 3
Slide 4