Difference between revisions of "project01:Expert5"

From 2628Climator
Jump to: navigation, search
(Parametric system)
 
(One intermediate revision by one user not shown)
Line 23: Line 23:
 
</div>
 
</div>
 
</div><br>
 
</div><br>
 +
 +
==Parametric system==
 +
Interactive diagram in relation to:
 +
Program, Internal/External relations, Climate strategy, Form optimization.
 +
 +
Used to for parametric distribution of program in building context.
 +
 +
Software:
 +
Rhino 5, Grasshopper, Kangaroo, GECO/ECOtect, Galapagos optimization
  
 
<html>
 
<html>
<iframe width="560" height="315" src="//www.youtube.com/embed/9MuuiW3VjxI" frameborder="0" allowfullscreen></iframe>
+
<iframe width="850" height="420" src="//www.youtube.com/embed/9MuuiW3VjxI?rel=0" frameborder="0" allowfullscreen></iframe>
 
</html>
 
</html>
  

Latest revision as of 01:31, 30 January 2014


Project'01 Banner.jpg


Parametric system

Interactive diagram in relation to: Program, Internal/External relations, Climate strategy, Form optimization.

Used to for parametric distribution of program in building context.

Software: Rhino 5, Grasshopper, Kangaroo, GECO/ECOtect, Galapagos optimization

Facade

2628 group1 final review Page 11.jpg Looking Up.jpg