Difference between revisions of "project02:Frontpage"

From 2628Climator
Jump to: navigation, search
(Plans&Model week 14)
Line 38: Line 38:
 
<br/>
 
<br/>
 
[[File:GR_2_D2Project_02_12-12-2013_D6.jpg.jpg|800px]]<br/>
 
[[File:GR_2_D2Project_02_12-12-2013_D6.jpg.jpg|800px]]<br/>
 
+
First model of construction.<br/>
GR 2 D2Project 02 12-12-2013 D6.jpg.jpg
+
<br/>
 +
[[File:GR_2_D2Project_02_12-12-2013_D7jpg|800px]]<br/>
 +
Sketch render of the public space.<br/>
 +
<br/>
 
<br/>
 
<br/>
  
Line 49: Line 52:
 
Visuals<br/>
 
Visuals<br/>
 
<br/>
 
<br/>
 
  
 
==Model&Skin week 13==
 
==Model&Skin week 13==

Revision as of 18:28, 18 December 2013



Group 2

author(s): Ira Tavlaridi, Jordy Vos, Roel Vogels, Thien Guang Dinh, Zhenke Jin


Plans&Model week 14

GR 2 D2Project 02 12-12-2013 D1.jpg
Plans and sections, to have a better understanding of continuous space.

GR 2 D2Project 02 12-12-2013 D2.jpg
Construction changes with different nodes. More one building one detail logic. Moving floors, outside facade components in the same space frame.

GR 2 D2Project 02 12-12-2013 D3.jpg
Node of the spaceframe. Reference. Adjusted to suit our concept.

GR 2 D2Project 02 12-12-2013 D6.jpg.jpg
First model of construction.

800px
Sketch render of the public space.



Sustainability & Materialisation



Visuals

Model&Skin week 13

GR 2 D2Project 02 6-12-2013 C4.jpg
Adjusted concept
GR 2 D2Project 02 6-12-2013 C5.jpg
Connections to neighbours and circulation on ground floor

GR 2 D2Project 02 6-12-2013 C6.jpg
GR 2 D2Project 02 6-12-2013 C7.jpg

Views from the model and perspectives. Working model.
Project 02 6-12-2013 C1.jpg
Start on the construction. Part of the skin.
The skin contains all the utilities into one system. One detail.

GR 2 D2Project 02 6-12-2013 C2.jpg
The components fit on the space-frame. There are 5 different types of components x 10 types of different sizes.


MID-TERM REVIEW



Add your comment
2628Climator welcomes all comments. If you do not want to be anonymous, register or log in. It is free.