Difference between revisions of "project02:Frontpage"

From 2628Climator
Jump to: navigation, search
Line 2: Line 2:
  
  
[[File:Group2 final banner.jpg|850x]]<br/>
+
[[File:Group2 final banner.jpg|850px]]<br/>
  
  

Revision as of 19:49, 23 January 2014


Group2 final banner.jpg



Group 2

author(s): Ira Tavlaridi, Jordy Vos, Roel Vogels, Thien Guang Dinh, Zhenke Jin

Finals

Group2 final render A.jpg
Group2 final render B.jpg
Group2 final render C.jpg
Group2 final render D.jpg
Group2 final render E.jpg


This slideshow shows the final renders.

week 17. Second last week.

GR 2 D2 Project 02 15-01-2014 D2.jpg
A fragment of the interior showing the programmatic and constructional systems.

A quick animation showing two cuts. Work in progress.

Further progress week 16

A quick animation showing the horizontal cuts.

Further progress week 15

GR 2 D2Project 03 18-12-2013 D1.jpg
Construction diagram. More flexibility and solutions for both sustainability and constructivity. Also a better view on how to use the inside panels. Next thing to work on is the connection with the ground.
GR 2 D2Project 03 18-12-2013 D3.jpg
First idea of the 3D floorplan. More floorplans will be drawn after refinement of the plan above. Things to work on: Landscape, circulation, vertical circulation and presenation of the drawing.
GR 2 D2Project 03 18-12-2013 D2.jpg
First idea of one 3D section. In total, there will be six sections. These 3D sections show the building in a different perspective, to get a better understanding.

Plans&Model week 14

GR 2 D2Project 02 12-12-2013 D1.jpg
Plans and sections, to have a better understanding of continuous space.

GR 2 D2Project 02 12-12-2013 D2.jpg
Construction changes with different nodes. More one building one detail logic. Moving floors, outside facade components in the same space frame.

GR 2 D2Project 02 12-12-2013 D3.jpg
Node of the spaceframe. Reference. Adjusted to suit our concept.

GR 2 D2Project 02 12-12-2013 D6.jpg.jpg
First model of construction.

GR 2 D2Project 02 12-12-2013 D7.jpg
Sketch render of the public space.



Model&Skin week 13

GR 2 D2Project 02 6-12-2013 C4.jpg
Adjusted concept
GR 2 D2Project 02 6-12-2013 C5.jpg
Connections to neighbours and circulation on ground floor

GR 2 D2Project 02 6-12-2013 C6.jpg
GR 2 D2Project 02 6-12-2013 C7.jpg

Views from the model and perspectives. Working model.
Project 02 6-12-2013 C1.jpg
Start on the construction. Part of the skin.
The skin contains all the utilities into one system. One detail.

GR 2 D2Project 02 6-12-2013 C2.jpg
The components fit on the space-frame. There are 5 different types of components x 10 types of different sizes.


MID-TERM REVIEW



Add your comment
2628Climator welcomes all comments. If you do not want to be anonymous, register or log in. It is free.