Shared:2628SwarmMasterPlan
From 2628Climator
Concept Process
2628 Swarm MasterPlan
File:Template midterm.zip
Conclusions of the commission meeting on 18-10-2013:
Conclusions of the inter-group meeting on 27-09-2013:
each cell’s public space connects to each adjacent cell’s public space
each cell’s built space connects to each adjacent cell’s built space
resulting in two systems (public space and built space) that are continous and are intertwined with each other.
The system is non-hierarchical and spatially organised like a sponge.