Difference between revisions of "Shared:2628SwarmMasterPlan"
From 2628Climator
(→2628 Swarm MasterPlan) |
(→2628 Swarm MasterPlan) |
||
Line 18: | Line 18: | ||
==2628 Swarm MasterPlan== | ==2628 Swarm MasterPlan== | ||
− | [[ | + | [[File:Template midterm.zip]] |
Conclusions of the commission meeting on '''18-10-2013''': | Conclusions of the commission meeting on '''18-10-2013''': | ||
<br> | <br> |
Revision as of 16:52, 1 November 2013
Concept Process
2628 Swarm MasterPlan
File:Template midterm.zip
Conclusions of the commission meeting on 18-10-2013:
Conclusions of the inter-group meeting on 27-09-2013:
each cell’s public space connects to each adjacent cell’s public space
each cell’s built space connects to each adjacent cell’s built space
resulting in two systems (public space and built space) that are continous and are intertwined with each other.
The system is non-hierarchical and spatially organised like a sponge.