Difference between revisions of "project06:Expert3"
From 2628Climator
(→Structure) |
(→Structure) |
||
Line 63: | Line 63: | ||
</div> | </div> | ||
=Structure= | =Structure= | ||
+ | ==January 10th, 2014== | ||
+ | |||
+ | ===Structural progress=== | ||
+ | [[File:Group6_structure1.jpg|850px]] | ||
+ | Preliminary render of the structural idea. The section is not variable yet and the structure doesn't follow the trimmed helices yet. The section (construction height) will be dependend on the span, which varies. The same goes for the floor heights so that sufficient free height is maintained as well as daylight entry. The structure will be simulated and optimised through Karamba, a structural analysis and optimisation add-on for Grasshopper. | ||
+ | |||
+ | ===Visualization in the helicoid=== | ||
+ | [[File:renderino.jpg|850px]] | ||
+ | |||
+ | ==Front view== | ||
+ | [[File:renderfrontview.jpg|850px]] | ||
==December 20th, 2013== | ==December 20th, 2013== |
Revision as of 19:30, 28 January 2014
Structure
January 10th, 2014
Structural progress
Preliminary render of the structural idea. The section is not variable yet and the structure doesn't follow the trimmed helices yet. The section (construction height) will be dependend on the span, which varies. The same goes for the floor heights so that sufficient free height is maintained as well as daylight entry. The structure will be simulated and optimised through Karamba, a structural analysis and optimisation add-on for Grasshopper.
Visualization in the helicoid
Front view
December 20th, 2013
Functional cutout
Structural concept
Structural Concept #2
Structural Idea #2
Public connections
shape development
structure development
Reference:
sendai mediatheque